Construction work should begin with the development plan, charting a future construction and counting the number of necessary materials. Consider a specific example.
Suppose the total length of the fence is more than 50 m: 30 m facade, 20 meters - one of the sides. Our fence is height of 2,5 meters.
For the construction of a fence from selected corrugated pipe next section:
for the pillars of the fence 60x60 / 2 mm;
Gates - 80x80 / ​​3 mm;
horizontal crossbar - 30x30 / 2 mm;
frame of the gate and the gate - 40x40 / 2 mm;
inner border gate and the gate - 20h20/2mm;
"Antizaglyadyvateli - 10x10 / 1,5 mm.
Corrugated use Type C-8 thick half a centimeter, for the facade of corrugated board chocolate color, and for disengagement from the neighbors - alyutsinkovy.
The next stage is the construction. First, install the corner post from which then construct the entire fence. To install this pillar drill hole depth okolo1 m, it lines the roofing material (creating a kind of shirt), set the pole, then betoniruem. It should be noted that the pipe for the fence will need to purchase a length of 11 m, sawed them na3 equal parts of 3.66 m each. Given the fact that the fence height is 2,5 m, the exact depth of the wells -1.16 pm
After hardening of concrete under the corner posts mark up the territory for the remaining pillars. Note the horizontal line on which the future will be convenient to measure the top of the remaining pillars. To this end, the water level will go well with a tube length of 20 m. We stretch a thread on the marked before marking and betoniruem wells. Recall that the poles be painted, otherwise they will rust, which will necessarily affect the quality of the fence.
Cut horizontal jumpers and their tight welds. Note that the jumpers should be welded to the posts do not, and between them. Practice shows that this method of welding adds design aesthetics. After welding, lathing, we clean all welds, paint where the paint got corrupted during the welding process. While the paint dries to begin cutting the size of 1960h240h3 mm.
Then, special roofing screws to fasten the cutting of the centers of the poles, fence sheathes Decking, which is also mounted to the frame with screws.
Now you can start building facade of the fence. With the help of the builder of planes strike a mark there, which will host the top of the fence. Mark up the place wells under the posts and drill holes are.

rss rss